In the last 12 months our crews have replaced low-pressure cast iron, PVC and galvanised low-pressure mains within our gas network with new high-pressure polyethylene pipes (poly pipes) in the following regions:
In the last 12 months our crews have replaced low-pressure cast iron, PVC and galvanised low-pressure mains within our gas network with new high-pressure polyethylene pipes (poly pipes) in the following regions:

Ararat - 17.7 kilometres
Stawell - 11.6 kilometres
Altona North - 5.6 kilometres
Sunshine – 9.1 kilometres
Geelong - 10.8 kilometres
Warrnambool – 36 kilometres