In the last 12 months our crews have replaced low-pressure cast iron, PVC and galvanised low-pressure mains within our gas network with new high-pressure polyethylene pipes (poly pipes) in the following regions:
-
Ararat - 17.7 kilometres
-
Stawell - 11.6 kilometres
-
Altona North - 5.6 kilometres
-
Sunshine – 9.1 kilometres
-
Geelong - 10.8 kilometres
-
Warrnambool – 36 kilometres