Location: 4km south-west of Glenrowan VIC

Timeframe: November 2022 to late 2023

Project background

AusNet was engaged by CIMIC Group company, Pacific Partnerships Pty Ltd, to connect the 125 megawatt (MW) Glenrowan Solar Farm to the electricity grid.

Completed in late 2023, the Glenrowan Solar Farm provides enough clean energy to power 45,000 homes each year.

What we did

AusNet designed, built, owns and operates the transmission assets for the solar farm.

This involved building approximately five kilometres of new 33kV grid connection assets from the solar farm to the Glenrowan Terminal Station and installing a new 120MVA transformer at the terminal station.

Long-term benefits

These works are enabling the solar farm to introduce more renewable energy to our electricity network. 